The Atal Setu has carried traffic from Sewri across the harbour since January 2024. Around its Mumbai end, and a few kilometres north at Wadala, five projects show what is being built on the island city's eastern edge. Lodha is selling Aureus in Sewri and building Lumis, the last tower of New Cuffe Parade. Godrej is building Horizon on a municipal chawl estate. Chamunda Infrastructure, a Navi Mumbai developer, has registered Aqua Bay, and Johaan Realtors and Developers has finished Signature Isle. MahaRERA's certificates for the projects still rising run to dates between May 2028 and April 2033. Our 45 listings in the five ask ₹2.75 crore to ₹11.99 crore. Most of the new transport promised around them is not built yet.
In 30 seconds
- the Atal Setu, open from Sewri since January 2024
- 21.8 km
- registered completion dates of the towers still rising
- 2028 to 2033
- our listings across the five, ₹2.75 Cr to ₹11.99 Cr
- 45 homes
- the new deadline for the Sewri-Worli elevated road
- 31 May 2027
- Lodha and Godrej are building; Chamunda Infrastructure has registered Aqua Bay; Johaan's Signature Isle was finished in 2024, its architect's practice says.
- The land runs from a 65-year MMRDA lease to a BMC chawl estate with a slum plot beside it.
- Lodha Aureus is registered to 30 April 2033, with a commencement certificate up to plinth level.
- No metro reaches Sewri yet, and the port's 2025 waterfront leases ruled out homes.
- Read the register, the land papers and the occupation certificate, flat by flat.
Reported by Property Butler Research, 18 November 2026. Prices are asking prices from our listings as our building pages printed them that day; rates are per sq ft of the area each listing quotes.
Where the bridge lands
The Atal Setu is a six-lane bridge of about 21.8 km from Sewri to Nhava Sheva, 16.5 km of it over the sea, built for more than ₹17,840 crore, the Prime Minister's Office said when it opened on 12 January 2024. The elevated road from Sewri to Worli is late. The state budget in March set it for September 2026; on 5 October the chief minister directed that it be finished and opened by 31 May 2027, the Free Press Journal reported.
No metro reaches Sewri yet. Metro Line 11, a 17.5 km, largely underground line from Wadala to the Gateway of India with stations at the Wadala truck terminal and Sewri, was still waiting for the Centre's approval in September, nearly a year after the state cleared it; tenders come only after that. Metro Line 4, from Wadala to Thane, is opening from the Thane end, its first section targeted for December 2026.
Side by side
What is built, and what is promised
Built and running
- The Atal Setu, Sewri to Nhava Sheva, open since January 2024.
- The Eastern Freeway.
- Harbour line trains at Sewri and Wadala Road.
- The monorail, with stations at Wadala Bridge and Wadala Depot.
Being built or still planned
- The Sewri-Worli elevated road: budgeted for September 2026, now given until 31 May 2027.
- Metro Line 11, Wadala to the Gateway of India via Sewri: waiting for the Centre's approval.
- Metro Line 4 from Wadala: its first section, in Thane, is targeted for December 2026.
- The Orange Gate to Marine Drive road tunnel: foundation stone laid in January 2024.
- The port's ₹22,672 crore waterfront plan, on a roadmap to 2047.
The waterfront is the port's
Much of the shore is port land. The Mumbai Port Authority has been the planning authority since December 2018 for a 966-hectare Eastern Waterfront. By August 2025 its draft plan was on hold, and the port offered 28 plots of more than 200 acres on 30-year leases, among them 25 acres at the Sewri timber pond and two Wadala sites, for commercial and industrial use only: no homes, the Free Press Journal reported. In February 2026 the shipping ministry reviewed a ₹22,672 crore plan for the waterfront to 2047, built around cargo, a marina, a convention centre at Princes' Dock and a government office complex at Cotton Green.
Inland, around the old truck terminal, the planner is MMRDA. The state leased it 126.64 hectares at Wadala in 1984 for the terminal; in 2010 an empowered committee decided to move the trucks out and develop the area "on the lines of Bandra-Kurla Complex", and the government sanctioned MMRDA's revised plan in 2019.
Five projects, four kinds of land
The towers here stand on very different ground, and the ground decides which papers a buyer should ask for.
Lodha New Cuffe Parade, Wadala
Lodha won 25,000 square metres of the truck terminal at an MMRDA auction in May 2010 with a bid of ₹4,053 crore, on a 65-year lease, DNA reported; it now describes New Cuffe Parade as 20 acres, 15 of them open space. Of the four registrations Lodha lists for it, one, "Lodha NCP Tower - 2", was registered in June 2022 with a completion date of 31 May 2029; MahaRERA has since extended it to 30 June 2030. Lodha's page says Lumis, the last tower, is due by 2029. Occupation certificates here come from MMRDA; in 2024 the Supreme Court held that its "Part Occupancy Certificate" for a flat in Lodha Evoq could not be equated with one. We hold 20 homes for sale across six towers, 16 of them ready to move into, at a median of ₹44,996 per sq ft; the four in Lumis ask ₹40,813. Our full review has more.
Godrej Horizon, Wadala
Godrej Horizon stands on Azad Nagar, a BMC estate on R.A. Kidwai Marg. Its 32 chawls, home to 320 tenants, were demolished in 2015 under an earlier redevelopment agreement, which the BMC ended in 2020, the Free Press Journal reported. In 2021 Godrej Properties agreed to redevelop the 7.5 acres; its filing that year describes about 1.6 million sq ft for sale, with Godrej to "construct space for society in lieu of the saleable area". On 8 May 2026 the BMC's general body voted 112 to 79 to hand Godrej Projects the plot, Azad Nagar with the adjoining Kamala Nagar slum, a week after a first vote fell short of the two-thirds it needed.
MahaRERA registers Horizon in three phases: Phase I from April 2022 to 31 May 2028, Phase II to 30 June 2029 and Phase III to 30 June 2031. Godrej's own target for possession is June 2027. It prices on saleable area: ₹4.32 crore for its smallest two-bedroom, before GST and stamp duty. We hold 10 homes for sale there, at a median of ₹51,152 per sq ft.
Lodha Aureus, Sewri
Lodha's Aureus sells three- and four-bedroom homes on what Lodha calls the "Eastern Waterfront". Its MahaRERA certificate (PR1170002502863), dated 30 October 2026, records two wings of 56 habitable floors with 354 homes between them, a commencement certificate up to plinth level, and a registration that began on 16 March 2026 and now runs to 30 April 2033; the original completion date was 31 December 2032. Separately, in February, Lodha registered a joint development agreement with two Sahana group companies for 41,526 square metres, about 10.3 acres, in the Parel-Sewri division, for ₹364.81 crore, the Free Press Journal reported. We hold five homes for sale in Aureus, on the 30th to 32nd floors, at a median of ₹43,872 per sq ft.
Aqua Bay, Sewri
Aqua Bay is registered under P51900079685 by Chamunda Infrastructure Limited of Vashi, from 20 March 2025 to 31 December 2028. Every project Chamunda lists as completed is in Navi Mumbai or Panvel; Aqua Bay is its only listing in Mumbai. The project's marketing site carries another name, "Aqua Bay Sewri by Arihant", and describes a freehold plot on Zakaria Bunder Road. It also advertises a metro station 80 metres away and an "Orange gate underground metro". The records disagree: no metro reaches Sewri yet, and the Orange Gate project is a 9.2 km road tunnel to Marine Drive, its foundation stone laid in January 2024. We hold four homes for sale there, at a median of ₹42,037 per sq ft.
Johaan Signature Isle, Wadala
The finished tower of the five is Signature Isle, registered in May 2019 by Johaan Realtors and Developers Private Limited for completion by 30 September 2023. Hafeez Contractor's practice lists it as a single tower of 76.35 metres on a 0.24-acre plot, over two levels of podium parking, completed in 2024. We hold six homes for sale there, listed as ready to move into; at a median of ₹56,310 per sq ft, it asks the most of the five.
By the numbers
When each registration runs out
- Godrej Horizon Phase I, Wadala31 May 2028
- Aqua Bay, Sewri31 Dec 2028
- Godrej Horizon Phase II, Wadala30 Jun 2029
- Lodha NCP Tower - 2, Wadala30 Jun 2030
- Godrej Horizon Phase III, Wadala30 Jun 2031
- Lodha Aureus, Sewri30 Apr 2033
What it asks
Across the five we hold 45 homes, all for sale and none to rent. Our Sewri median is ₹42,037 per sq ft across 19 homes; Wadala's is ₹45,005 across 49.
Asking prices
What our listings ask, by building
- Johaan Signature Isle, Wadala6 homes₹2.75 Cr to ₹8.5 Cr
- Aqua Bay, Sewri4 homes₹2.93 Cr to ₹3.62 Cr
- Godrej Horizon, Wadala10 homes₹3.18 Cr to ₹11.99 Cr
- Lodha New Cuffe Parade, Wadala20 homes₹3.5 Cr to ₹8.34 Cr
- Lodha Aureus, Sewri5 homes₹4.6 Cr to ₹10.7 Cr
By the numbers
Median asking per sq ft, by building
- Johaan Signature Isle (6 homes)₹56,310
- Godrej Horizon (10 homes)₹51,152
- Lodha New Cuffe Parade (20 homes)₹44,996
- Lodha Aureus (5 homes)₹43,872
- Aqua Bay (4 homes)₹42,037
Getting around
From each project's MahaRERA map point
Walking to a train
- Aqua Bay to Sewri station0.47 km · 6 min walk
- Lodha Aureus to Sewri station0.47 km · 6 min walk
- Godrej Horizon to Wadala Bridge monorail0.57 km · 8 min walk
- Godrej Horizon to Wadala Road station0.74 km · 10 min walk
- Lodha New Cuffe Parade to Wadala Depot monorail0.81 km · 11 min walk
walk
Each walk takes 11 minutes or less.
Timeline
The eastern edge, in the records
1984
Maharashtra leases 126.64 hectares at Wadala to MMRDA for a truck terminal.
May 2010
Lodha wins 25,000 sq m of the terminal at an MMRDA auction for ₹4,053 crore, on a 65-year lease.
2015
Azad Nagar's 32 BMC chawls, home to 320 tenants, are demolished for redevelopment.
May 2019
Johaan registers Signature Isle, for completion by 30 September 2023.
2020
The BMC ends Azad Nagar's earlier redevelopment agreement.
April 2022
Godrej registers Horizon Phase I; Lodha registers NCP Tower - 2 in June.
January 2024
The Atal Setu opens from Sewri to Nhava Sheva.
February 2024
The Supreme Court holds, in a Lodha Evoq case, that a part OC cannot be equated with an OC.
March 2025
Chamunda Infrastructure registers Aqua Bay, to 31 December 2028.
April 2025
MahaRERA extends Lodha NCP Tower - 2 to 30 June 2030.
February 2026
Lodha registers a 10.3-acre joint development agreement in Parel-Sewri.
March 2026
Lodha registers Aureus.
May 2026
The BMC's general body votes 112 to 79 to hand Godrej the 7.5-acre plot.
October 2026
Aureus is registered to 30 April 2033; the Sewri-Worli road is given until 31 May 2027.
MilestoneTroubleGood news
Our view
Lodha and Godrej are putting large sums into the eastern edge, and the homes we hold there ask about ₹41,000 to ₹56,000 per sq ft at the median. What sets these towers apart is their paperwork: an MMRDA lease, a municipal estate with a slum plot beside it, a brand that is not the promoter. Of the new links, only the bridge is open. Buy the flat and the papers that exist today, and count a promised road or metro as a bonus.
Before you buy
Before you buy on the eastern edge
- The promoter's name on MahaRERA, and that it is the company signing your agreement.
- The registration certificate for your tower or phase: the date it runs to, and any extension or correction.
- For a tower still rising, the commencement certificate for your floor. Aureus's certificate records one up to plinth level.
- What the land is, an MMRDA lease, a BMC redevelopment, a slum scheme or a private plot, and a title report to match.
- For Lodha Aureus, which plots the tower stands on and under which scheme it was approved.
- For Godrej Horizon, the BMC's permissions for Azad Nagar, and Godrej's answer in writing on any case about the land.
- For Lumis, which registration covers your flat and the date on it.
- For a finished tower, the full occupation certificate for your floor. A part OC is not enough.
- The carpet area in your agreement, not a saleable figure from a price list.
- Any road or metro promised nearby, as a date in a government record.
Sources
- Prime Minister's Office, Atal Setu inauguration, 12 January 2024. www.pmindia.gov.in
- Free Press Journal, Maharashtra Budget 2026, 6 March 2026. www.freepressjournal.in
- Free Press Journal, Fadnavis targets 70 km of metro corridors in 2027, 5 October 2026. www.freepressjournal.in
- Free Press Journal, Metro Line 11 awaits Centre's nod, 16 September 2026. www.freepressjournal.in
- Free Press Journal, Thane Metro Line 4 likely by December, 22 October 2026. www.freepressjournal.in
- Free Press Journal, Mumbai Port Authority to lease 28 plots, 12 August 2025. www.freepressjournal.in
- Press Information Bureau, Mumbai Port's Eastern Waterfront plan, 6 February 2026. www.pib.gov.in
- MMRDA, Wadala Notified Area. www.mmrda.maharashtra.gov.in
- DNA, Wadala plot goes for Rs4,053 crore, 26 May 2010. www.dnaindia.com
- Lodha Group, Lodha New Cuffe Parade, read 17 November 2026. www.lodhagroup.com
- Supreme Court, Venkataraman Krishnamurthy v Lodha Crown Buildmart, 22 February 2024. indiankanoon.org
- Free Press Journal, Wadala housing redevelopment project to finally take off, 15 October 2021. www.freepressjournal.in
- Godrej Properties, results presentation, 2 November 2021. www.bseindia.com
- Free Press Journal, BMC House sanctions Wadala project with Godrej, 9 May 2026. www.freepressjournal.in
- Godrej Properties, Godrej Horizon price and RERA details, 21 August 2026. www.godrejproperties.com
- Lodha Group, Lodha Aureus, read 17 November 2026. www.lodhagroup.com
- Free Press Journal, Lodha signs ₹364.81 crore JDA for Parel-Sewri land, 22 February 2026. www.freepressjournal.in
- Chamunda Infrastructure, Projects, read 17 November 2026. chamundainfra.com
- Aqua Bay Sewri, marketing site, read 17 November 2026. aquabaysewri.com
- Hafeez Contractor, Johaan Signature Isle. www.hafeezcontractor.com
- MahaRERA, project search and the certificates it shows, read 17 and 18 November 2026. maharera.maharashtra.gov.in
- Property Butler listings, 18 November 2026: Aqua Bay, Lodha Aureus, Johaan Signature Isle, Lodha New Cuffe Parade and Godrej Horizon. Asking prices.
- Walks on OpenStreetMap foot routing, 17 November 2026.
Corrections are made in this article with the date. Write to info@propertybutler.in.