Skip to content

Bandra West and Khar's new office buildings

Every office we hold there, to lease or buy, with size, floor and the asking rent or price.

Only Property Butler sees your number. We never pass it to developers or other brokers.

By sending, you agree we may WhatsApp or call you about this request. Privacy policy.

Or WhatsApp us

In two days in November 2026, the sales papers for six new office buildings in Bandra West and Khar reached Property Butler's commercial desk.

Rockwell Developers sent a photo of glass going up on a concrete frame on Linking Road. Webtech Realty's note said the full occupation certificate for The Presidential was 45 to 60 days away. The same note put a metro station five minutes from the door. The sales post for 33 Fifteen called it LEED-certified.

MahaRERA registered all six between February 2022 and April 2026. Two have passed the completion dates on their certificates, with no extension on MahaRERA's list. None of the metro stations planned on these streets is open.

In 30 seconds

new office buildings on four streets
6
the years MahaRERA registered them
2022 to 2026
past their MahaRERA date, no extension listed
2
Line 2B stations open near them
0
  • Linking Road: 11:11 Business Park. Just off it, on 33rd Road: 33 Fifteen.
  • S.V. Road: The Presidential. Khar West: Amore Edge.
  • Turner Road: Turner House and Notan Jewel.
  • BKC is 3.7 to 5.9 km away by road.

Four streets

11:11 Business Park stands on Linking Road. Rockwell Developers is redeveloping final plot 230 of Bandra's third town planning scheme there. Its plan draws one office to a typical floor, and its note gives an office about 2,163 sq ft. Cars park in a tower inside the building. MahaRERA registered the project on 30 January 2023.

The 7th floor is the exception. Its office of 1,500 sq ft sits beside a refuge area of 600 sq ft, kept for people to shelter in during a fire. Rockwell's card says that area is not sold.

33 Fifteen takes its name from its corner, where 33rd Road meets 15th Road, just off Linking Road. Rustomjee and Ajmera are building it together, through a company called Ajmera Luxe Realty. MahaRERA registered the offices in September 2025, as the commercial wing of the project. Rustomjee says Standard Chartered Bank funds it.

The Presidential is on S.V. Road. Webtech Realty puts it a minute from Turner Road. MahaRERA registered it in March 2023 under another name, The Wave, and Webtech prints the same registration number on its own pages for The Presidential. Its note gives the ground to 3rd floors to shops and restaurants, and the 4th to 17th to offices. Cars go into seven basement levels of automated parking.

Webtech Realty was set up in 2022. Its site lists one finished building, a block of flats in Khar West. The Presidential is the only office building on it.

Amore Edge is in Khar West, pin code 400052. G.M. Heights LLP registered it with MahaRERA on 9 February 2022, the first of the six.

Turner Road holds two. Raiaskaran is building Turner House behind a restored heritage front, which it sells for shops as The Palazzo. Above them it keeps a few office suites to a floor, with a private lift lobby on each. MahaRERA registered the project in December 2022, in the name of Variegate Real Estate, which Raiaskaran's websites name as the owner.

Notandas Realty works from Notan Plaza, on the same road. It is putting up Notan Jewel with a front of aluminium mesh over glass. Its sales team's note gives one office suite to a floor, of about 1,500 to 2,100 sq ft of carpet. MahaRERA registered it on 17 April 2026, the latest of the six, in the name of SSD Properties LLP. Notandas prints the same registration number on its own page for the building. Its site lists ten earlier buildings, six of them in Bandra West.

More are coming. Ekta World has announced six office projects around Linking Road, Hill Road and Turner Road, with ₹1,200 crore behind them. Two are on land it bought outright, and four are redevelopments.

What the dates show

Developers have had to register their projects under construction since 1 May 2017, when the real estate act came into force. A building finished before then has no MahaRERA number. These six all registered in the last five years.

A registration runs to the completion date the developer declares. Amore Edge's ran to 31 December 2025. MahaRERA's list shows no extension, and its record holds no occupation certificate. The record calls the project lapsed.

The Free Press Journal set out MahaRERA's rule for lapsed projects in June 2024. "Once a project is declared lapsed, its bank accounts are sealed." The developer "is also barred from advertising and marketing besides selling and registering the flats." A project finished late gets out of it by filing its occupation certificate with MahaRERA.

The Presidential's certificate, under the name The Wave, ran to 31 July 2026. No extension is on the list either. Webtech's website says the building has a part occupation certificate, and its note of 20 November put the work at 90%.

11:11 Business Park's first date was 31 December 2025. MahaRERA approved an extension on 15 April 2026, and the registration now runs to 31 December 2027. MahaRERA's record holds no occupation certificate for it.

The other three have later dates. Turner House runs to 31 March 2028. Raiaskaran's retail page says The Palazzo, its shops, already has an occupation certificate. 33 Fifteen's date is 31 May 2029. Its commencement certificate reaches the plinth, with four basement levels. Notan Jewel's date is 31 March 2030. In April 2026 its commencement certificate reached the top of the plinth.

Floors on paper

Rockwell's card counts 22 floors at 11:11. MahaRERA's record of the project counts 25. The card also sells a unit below the ground floor.

Webtech's note gives The Presidential 17 floors above seven basements. MahaRERA's record counts 25, which is what the seven, the ground floor and the 17 add up to.

Raiaskaran gives Turner House a ground floor and 17 above it. MahaRERA's record counts 21.

33 Fifteen's sales team sells offices up to the 15th floor. MahaRERA's certificate records ten sanctioned habitable floors in the commercial wing. The developers' environmental clearance is restricted to 45.55 metres, under a civil aviation clearance of April 2024.

No document gives Notan Jewel a floor count.

Side by side

What the sales papers say, and what the records say

The sales papers

  • The Presidential: the full occupation certificate expected in 45 to 60 days (Webtech's note, 20 November 2026).
  • 11:11 Business Park: 22 floors, nearing possession (Rockwell).
  • Turner House: a ground floor and 17 floors, LEED Platinum (Raiaskaran).
  • 33 Fifteen: a ground floor and 15 floors, possession in September 2029, LEED-certified (the sales post).
  • Metro: five minutes from The Presidential and from Turner House (Webtech, Raiaskaran).

The records

  • MahaRERA: registered as The Wave, valid to 31 July 2026, with no extension on the list.
  • MahaRERA: 25 floors on the record; the completion date moved from December 2025 to December 2027.
  • MahaRERA: 21 floors on the record. The certificate pictured in the brochure is for an existing building's operations, May 2022.
  • MahaRERA: ten sanctioned habitable floors in the commercial wing, completion 31 May 2029. The October brochure names no LEED rating.
  • MMRDA, update of 31 August 2026: no Line 2B station near Bandra is open, and no date is given.

For any of them, ask to see your floor on the approved plan, and the commencement certificate that reaches it.

The metro on the brochures

Raiaskaran's brochure of February 2024 puts a Bandra metro station five minutes from Turner House. Its website calls the station proposed. Rustomjee gives 0.85 km from 33 Fifteen to National College metro station.

National College is a stop on Metro Line 2B, which runs from D.N. Nagar to Mandale. OpenStreetMap places its sites at Khira Nagar, Saraswat Nagar and National College along S.V. Road. On MMRDA's list the line then runs to Bandra Metro, and on to Income Tax office, ILFS and MTNL Metro. OpenStreetMap places ILFS and MTNL Metro in BKC.

MMRDA's update of 31 August 2026 has the line running only at its eastern end. The stretch from Mandale to Diamond Garden opened on 7 April 2026. The next station, Chembur, followed on 13 August 2026. MMRDA's page gives no date for the stations near Bandra.

The metro that runs today is the Aqua Line, on the far side of the railway. Its Bandra Colony station is 2.1 to 3 km on foot from these streets, on OpenStreetMap's routing. Each of the streets is about a kilometre or less on foot from Khar Road or Bandra station.

BKC, by road

By road, the Aqua Line's BKC station is 3.7 to 4.2 km from these streets. Jio World Centre, in BKC's G Block, is 5.4 to 5.9 km. Those are OpenStreetMap's shortest routes, without traffic.

Rustomjee gives 5.7 km from 33 Fifteen to BKC. Raiaskaran gives 15 minutes from Turner House. The Western Express Highway, at Kherwadi, is 2.7 to 3.2 km away.

By the numbers

By road to Jio World Centre, BKC

  • S.V. Road at Turner Road5.4 km
  • Turner Road, west of S.V. Road5.5 km
  • Linking Road at 33rd Road5.9 km
  • S.V. Road in Khar West5.9 km
OpenStreetMap routing, 21 November 2026: the shortest route by car, without traffic, from a point on each street. The Aqua Line's BKC station is about 1.7 km nearer.

What the sales teams ask

Rockwell's card asks ₹75,000 a sq ft for 11:11's offices. Its project note of the same day says ₹78,000. Neither says whether the area is RERA carpet. The card prices each car park at ₹20 lakh.

33 Fifteen's sales team quotes ₹83,000 a sq ft, plus taxes and charges, with one car park. The developers' availability sheet of 8 October 2026 starts at 682 sq ft of carpet. It prices each office all inclusive.

Neither Turner Road building's sales papers name a price. Raiaskaran's enquiry form offers its offices to lease or to buy.

An office bought from the developer before its occupation certificate usually carries 12% GST, and one bought after it carries none. The developer's cost sheet decides. Stamp duty in Mumbai is 6%, and registration adds ₹30,000, the cap.

Before you sign

Ask for the occupation certificate that covers your floor. If there is none yet, ask for the date the developer gives MahaRERA.

Look up the registration on MahaRERA, for its completion date and any extension.

Get the RERA carpet of your office in the agreement, and work every rate on it.

Ask whether the project is mortgaged. A mortgaged project needs the lender's no-objection letter before the agreement for sale.

Ask how many car parks come with your office, and what they cost. Raiaskaran sells parking at Turner House as a club membership, with valets.

Ask to see any green-building certificate itself. The one pictured in Turner House's brochure is for the operations and maintenance of an existing building, dated May 2022. 33 Fifteen's March brochure spoke of LEED, and its October brochure does not.

Sources: MahaRERA's registration certificates for P51800033249, P51800047873, P51800049065 (the extension of 19 August 2026), P51800050188, PC1180002500764 and PR1180002600128, and MahaRERA's project records, read 21 November 2026; the developers' sales papers sent to Property Butler on 20 and 21 November 2026, and their websites (rustomjee.com, ajmera.com, webtechrealty.com, turnerhouse.in, raiaskaran.com, notandasrealty.com), read 21 November 2026; MMRDA's Metro Line 2B page (update of 31 August 2026); Free Press Journal (10 June 2024); The Pioneer, as carried by the Press Information Bureau (1 May 2017); Construction World (3 September 2026); OpenStreetMap and its routing (21 November 2026).

Reported by Property Butler Research, 21 November 2026.

Frequently asked

Which new office buildings are coming up in Bandra West and Khar?

11:11 Business Park on Linking Road, 33 Fifteen on 33rd Road, The Presidential on S.V. Road, Amore Edge in Khar West, and Turner House and Notan Jewel on Turner Road. MahaRERA registered all six between 2022 and 2026.

Is there a metro station near Linking Road and S.V. Road?

Line 2B will stop at National College, Saraswat Nagar and Khira Nagar on S.V. Road. MMRDA's update of 31 August 2026 shows only its eastern end, Mandale to Chembur, running.

How far is BKC from Bandra West's new office buildings?

By road, 3.7 to 4.2 km to the Aqua Line's BKC station and 5.4 to 5.9 km to Jio World Centre, on OpenStreetMap's routing without traffic.

Which of these buildings have passed their MahaRERA completion date?

Amore Edge (31 December 2025) and The Presidential, registered as The Wave (31 July 2026), with no extension on MahaRERA's list. 11:11 Business Park's first date was extended to 31 December 2027.

Property Butler · Replies on WhatsApp

Looking for an office in Mumbai? Get the live list.

Every office we hold there, to lease or buy, with size, floor and the asking rent or price.

Prithvi ShahManaging Partner · Negotiation and closing across MumbaiWhatsApp us

Outside India? Start with your country code, for example +971.

Or WhatsApp us

Only Property Butler sees your number. We never pass it to developers or other brokers.

We'll reply on WhatsApp as soon as possible.

Property Butler LLP · MahaRERA A061182600690

By sending, you agree we may WhatsApp or call you about this request. Privacy policy.

More on Bandra West

Read Next

Need help with a specific Mumbai property?

WhatsApp us
WhatsApp us